DUFORT RD - PRIEST RIVER
Trusses set, one wing framed - day 4.
Second wing framed, roofs sheeted - day 5.
Finished view of front, with board-and-batten siding, and rusted-metal wainscoting.
Side-view of closed wing.
Rear view.
Rear view from other side.
Started framing walls - day 3.
Poured concrete foundation with footings, power-troweled finish.
Gun Club Rd, sagle, id
40'x60''x16' pole building with concrete.
Power-troweled concrete finish.
Trusses set 2'-on-center, and sheeted for a 75-lb/sq ft snow load - what you need for those long, Idaho winters. Compare with other companies "basic" package.
Finished product!
sandpoint, id
Driveway, house sidewalks, front sidewalks, and back patio.
Concrete truck with pumper to get the concrete where we need it!
John laying down the concrete and screeding it flat.
Sidewalks running around the building.
Sidewalks running around the building.
Sidewalks all laid down, bull-floating the driveway.
Sidewalks all laid down, bull-floating the driveway.
Settting up grid for final pour.
Back patio, with broomed finish.
Ready for final pour.
Blue sky rd - Bonners Ferry, ID
The customer wants an addition where the current bay window is, as well as a front porch. To add interest to the roofline, they also want a false dormer over the garage.
Rear view of the house before we started.
Our crew removinng current metal roofing.
Once the footings and stemwall were poured, the addition is ready for vapor barrier, venting and ducting, and framing.
Deck is framed and removing the bay window.
The addition is framed and ready for trusses.
We had to cut out a portion of the rear roof to accomodate the scissor trusses the owner wanted for a vaulted porch ceiling.
Amazing that it's the same house! There is a new front porch, and the matching false dormer. Client has decided to side the house next year.
The rear porch extension with vaulted trusses.
The false dormer over the rear garage. Client decided on a shingled roof versus a netal roof for his new look.
wrenco loop road
30'x74'x14 shop with seven open bays in the front for vehicles and equipment. Customer wanted a shed roof, and poles encased in concrete,
wrenco loop road
End of Day 2 - Poles set and beam installed. Ready for trusses.
wrenco loop rd, dover, ID
Trusses almost all set.
wrenco loop rd, dover, ID
End of Day 3 - Roof sheeted and synthetic metal paper installed.
wrenco loop rd, dover, ID
Endview of the buillding, showing shed-roof configuration.
wrenco loop rd, dover, ID
Wall metal going on.
wrenco loop rd, dover, ID
Wall metal almost all up!
wrenco loop rd, dover, ID
Finished building all trimmed out.
wrenco loop rd, dover, ID
End view of building with wall metal on.
jewel lake road - 40'x60'x16' with lean-to
Day 1 - Poles are set and framing up.
Day 1
Over-head door framed in, lean-to poles set.
Day 2
Framed lean-to and sheeting lean-to roof.
Day 2
Lean-to is sheeted, building ready for trusses!
Day 3
Truss-truck is here, ready to set.
Day 3
Truss-truck is here, ready to
Day 3
Setting the trusses.
Day 3
Almost done.
Day 3
Trussed roof is sheeted, ready for metal!
Day 4
Sheeting the roof.
Day 4
Putting up the wall steel
Day 4
One wall done!
Day 5
Wall metal on - view of building rear.
Day 5
Wall metal on - view of building side.
Day 5
Wall metal on - view of building front.
Day 5
Wall metal on - view from inside building.
Day 5
Wall metal on - view from top of the lean-to.
Day 5
Overall view of the finished building.
troy school district
Multiple pours for the school district - 1st is at the football field. Gettiing set up.
troy school district
Gradiing the site.
troy school district
First part of the pour done.
troy school district
Leveling and screeding the concrete.
troy school district
30-yard pour completed!
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
troy school district
More pads being poured.
Priest River, id
Garage pad and framing the house. Here is the pad formed with rebar, ready for concrete.
Power-troweled finish.
Ready to start framing the deck.
But first, have to pour the sonic tubes that will hold up the hot tub deck.
Support wall framing done, and joists are started.
Since he lives up on a mountain, the owner wants extra water storage in the crawl space.
Joists going on.
Joists going on.
Framing the walls.
Framing the walls
Eastport, id
Forming and pouring footings, stem walls, and foam block walls. Here, we have formed the footings.
Formed footings.
Concrete poured.
Setting up the foam blocks.
Formed footings.
Forming block walls.
Forming block walls.
Forming block walls.
Pumping concrete into block forms.
Pumping concrete into block forms.
Brown creek rd - bonners ferry
Owner had an ice dam problem, with water dripping into the house as it melted. We are putting on a roof extension and adding IceMelt under the shingles.
Step 1 was pulling the existing fascia off to access the bearing wall. Step 2 is drilling holes and putting posts in to support the roof extension.
Next step is putting up the rafters and sheeting the roof.
After adding IceMelt, the roof was shingled.
There should be no more problems with water leaking in!
comanche st - bonners ferry
New pad and sidewalk. Shout-out to Down 2 Earth Works for the dirt work done!
Setting up form boards for driveway & sidewalk.
Had to cut out and demo old sidewalk and step.
Working with Down 2 Earth Works to to shore up downhill side for new concrete.
Working with Down 2 Earth Works to to shore up downhill side for new concrete.
Formed and rebar set up.
Laying down the concrete.
Laying down the concrete.
Laying down the concrete.
Final touch to the broom finish - hand and foot prints!
Final touch to the broom finish - hand and foot prints!
Finished concrete - cut and forms off.
Finished concrete - cut and forms off.
Finished concrete - cut and forms off.
Finished concrete - cut and forms off.
Final touch to the broom finish - hand & foot prints!
Final touch to the broom finish - hand & foot prints!
Morning glory rd - bonners ferry
New sidewalk, steps to match existing color.
Steip off existing porch.
Back porch sidewalk.
Back porch sidewalk - adding the color.
Front porch sidewalk - adding the color.
Troweling in the color.
Step colored.
Finished product.
priest lake, id
36'x36' shop, with shed roof, overhead door, and walk door.
Setting up - ready to go.
First wall up!
Second and third walls up.
Putting up sheeting.
Walls up and sheeting started.
Walls up and sheeting started.
Roof tursses set, and roof sheeting going on.
Setting roof trusses.
Lower siding started.
Bracing the inside.
Bracing the inside.
Siding applied, soffits decoratively braced.
Soffits and vents
Building is roofed and sided.
Almost complete!
Bull lake rod & gun club
30'x40' open shelter with overhangs and metal roof.
Trusses going on!
Trusses going on!
Roof sheeted and ready for metal.
Metal up on the shelter.
Prepping the shelter for concrete.
troy, mt
30'x30'x12' pole building with walk door and overhead door.
bull lake rd, troy, mt
80'x30'x12' shed-style pole building. Includes 50'x30' enclosed shop area with concrete and enclosed 30'x30' parking area.
Trusses set, roof sheeted, and synthetic paper on the roof.
View from underneath.
Side view
blanchard, id
24'x36'x10' stick-tramed shop with poured foundation/slab.
Leveling and squaring pad, diggiing foundation for mono-pour. Dirtwork provided by Down 2 Earth Works.
Leveling and squaring pad, diggiing foundation for mono-pour. Dirtwork provided by Down 2 Earth Works.
Pad poured and ready for walls.
Walls are going up!
Walls are going up!
Walls are going up!
Sheeting the walls.
Housewrap added.
Housewrap added.
Apron added in front of the overhead door.
Apron added in front of the overhead door.
Apron added in front of the overhead door.
Apron added in front of the overhead door.
Finished pad!
Siding going up!
Siding going up!
Siding going up!
lake creek troy, mt
Demo old metal roof, apply new sheeting to old skip-sheeting, cover with synthetic metal paper, and apply new metal.
Metal taken off, getting ready to apply new sheeting.
Applying new sheeting and paper.
Ready for metal!
pine street bonners ferry
24'x36'x14' pole building with two overhead doors, a 10' wide lean-to from the side, concrete inside plus an apron outside.
Outside view from the lean-to side.
Applying the metal.
Applying the metal.
Applying the metal.
From the lean-to side.
From the front, with concrete in the shop, and apron in front.
From the front, with concrete in the shop, and apron in front.
From the front, with concrete in the shop, and apron in front.
Birch beauty rd Priest river, ID
30'x50'x14' framed shop with concrete floor and stem walls. The roof is 10/12 pitch with vault. Shop has 14'x14' overhead door, and turkey-tail soffit in front.